TRI-CITY ELECTRIC CO.
CONFIDENCE DELIVERED.®
Change Order Breakdown
Drop a D-Tools Project Summary or McCormick Bid Summary PDF here or click to browse — auto-fills job info, CO amount, material cost & markup, labor hours, rate/hr, labor markup, DJE, and shipping

Job Identification

Material and Labor

Material
Contingency is netted out before markup and carried at raw cost; on credit COs (negative material cost) a positive contingency offsets the credit instead. Use Tax status: material cost includes use tax — the tax is backed out (Net Material ÷ (1 + Use Tax %) = pre-tax base; Use Tax = the difference) and markup applies to the tax-inclusive cost. Sales tax is never calculated on Use Tax jobs.
Labor

Rental Equipment Used & Rate

Enter rental equipment as flat dollar amounts for each type used.

Subcontractor Costs

Enter each subcontractor cost as a flat dollar amount. Mark up applies to the combined subcontractor cost.

Misc Totals

Indirect Costs & Contingency
Totals
DJE is calculated automatically — it shows how much $ goes to Direct Job Expense to reach the CO amount at the top. Sales Tax only applies when Tax Status is "Sales Tax." Shipping and Markup Retention are added after tax and are never taxed — use Markup Retention on credited COs for markup saved on returned material; it does not touch Net Material, markup, or the use tax back-out.
Sheet Total
Enter a Change Order Amount to check for a match
$0.00

Sign-Off